Case study
France, ground beams, 11.5 MWp
/--/uploads/sites/3/2026/09/etude-france-longrines-11-5-mwc-4.jpg)
The Ligelios solar power plant, on the western outskirts of the town of Colmar, is now up and running!
Total installed capacity: at 11.5 MWp, the plant’s output will cover the equivalent of the annual electricity consumption of more than 6,000 people and avoid 3,300 tonnes of CO2 emissions a year!
Project specifics: to make the best possible use of this former waste storage site, our teams laid 2,334 ground beams directly on the ground, which will support 21,006 modules.
Our contribution: Engie Green trusted us with the overall coordination of the structures package: studies and structural design, ground beam construction and screw installation, then installation of the structures and modules.