Case study

France, ground beams, 11.5 MWp

  • CompanyEngie Green
  • TypeEnerGround, ground beams
  • LocationFrance
  • Power11.5 MWp
Vue aérienne de la centrale solaire Ligelios sur l'ancien site de stockage de déchets

The Ligelios solar power plant, on the western outskirts of the town of Colmar, is now up and running!

Total installed capacity: at 11.5 MWp, the plant’s output will cover the equivalent of the annual electricity consumption of more than 6,000 people and avoid 3,300 tonnes of CO2 emissions a year!

Project specifics: to make the best possible use of this former waste storage site, our teams laid 2,334 ground beams directly on the ground, which will support 21,006 modules.

Our contribution: Engie Green trusted us with the overall coordination of the structures package: studies and structural design, ground beam construction and screw installation, then installation of the structures and modules.