A 100% local project for Belourthe, with Reno Energy and Ecostal!
Total installed capacity: 1.85 MWp
Project specifics: as the site lies in a flood zone, we adapted our structure on screw foundations to give a minimum ground clearance of 1.20 m. As usual in such conditions, our team handled the logistics of this project on frequently waterlogged ground without difficulty.
Our contribution: we coordinated the “structure” package from design through to the installation of the panels, which were supplied by our parent company, Ecostal.